12 dome installation 11 splicing of ribbon cable – Tyco Electronics FOSC-400D5 User Manual

Page 14

Advertising
background image

10.6

Secure all trays to the bottom tray

bracket with the Velcro strap as shown.

11.1

Identify each ribbon. Split each ribbon

into individual fibers. Follow the

manufacturer’s recommendations for the split-

ting ribbons. Splice and organise the fibers as
explained in section 10.

12.1

Open and remove the desiccant bag

from its package and place the desiccant bag
on the upper tray. Secure the trays and the
desiccant bag with the Velcro strap.

12.2

Ensure seal areas and sealing ring are

clean and that the sealing ring is in place at the
base.

12 Dome

installation

11

Splicing of ribbon cable

Velcro strap

Ribbon

Important.
Make sure the sealing ring is well
positioned.

Advertising