VEGA VEGAWELL 72 4 … 20 mA_HART PT 100 User Manual

Page 21

Advertising
background image

1

2

1

3

+

1

2

3

4

5

6

1

2

3

4

5

6

Fig. 8: Terminal assignment VEGABOX 02
1

To power supply or the processing system (signal pressure transmitter)

2

To power supply or the processing system (connection cables resistance
thermometer Pt 100)

3

Shielding

4

)

Wire number

Wire colour/Polarity

Terminal VEGABOX 02

1

brown (+)

1

2

blue (-)

2

3

W

hite

3

4

Y

ellow

4

5

R

ed

5

6

B

lack

6

S

hielding

G

round

1

2

3

4

-

-

+

mA

+

1

2

1

2

1

2

3

+

+

Fig. 9: Terminal assignment VEGABOX 02
1

To power supply or the processing system (signal pressure transmitter)

2

For voltage supply or to processing system (resistance thermometer Pt 100)

3

Shielding

5

)

4)

C

onnect screen to ground terminal. Connect ground terminal on the outside

of the housing as prescribed. The two terminals are galvanically connected.

5)

C

onnect screen to ground terminal. Connect ground terminal on the outside

of the housing as prescribed. The two terminals are galvanically connected.

Connection via
VEGABOX 02

Connection via
VEGABOX 02 with inte-
grated transmitter for
Pt 100

VEGAWELL

72 • 4 … 20

mA/HART PT

21

5 C

onnecting to power supply

34360

-

EN

-080806

Advertising