8 switch-on phase – VEGA VEGADIF 65 4 … 20 mA_HART User Manual

Page 41

Advertising
background image

41

5 Connecting to power supply

VEGADIF 65 • 4 … 20 mA/HART

36128-EN-130417

1 2 3 4

3

4

1

2

5

Fig. 44: Connection of the sensor in the housing base
1 Brown

2 Blue

3 Yellow

4 White

5 Shielding

I2C

Display

1

1

2

5

6

7

8

Fig. 45: Wiring plan external electronics
1 Voltage supply

5.8 Switch-on phase

After connecting VEGADIF 65 to power supply or after a voltage

recurrence, the instrument carries out a self-check for approx. 30

seconds:

Internal check of the electronics

Indication of the instrument type, the firmware as well as the sen-

sor TAGs (sensor designation)

Output signal jumps for approx. 15 seconds to the set fault current

Terminal compartment for

sensor connection

Wiring plan external

electronics

Switch-on phase

Advertising