Wha-gw, Installation – VEGA WHA-GW-WIRELESSHART GATEWAY User Manual

Page 32

Advertising
background image

22

1981

2011

-0

7

32

WHA-GW-*

Installation

7. If you want to connect a redundant power supply (optional), draw the second power

cable through the cable gland on the far right of the housing.

8. Connect the second power cable to the second power supply connection "Line 2"

observing polarity.

The Gateway is connected to power supply. The green power LED may remain off for
up to 40 seconds after connection to power (system boot-up).

9. Tighten the cable glands with appropriate torque (see table "Installation torque cable

glands" on page 32).

10.Seal empty cable glands with the provided plugs.

Installation torque cable glands

Note!

The tightening torques of cable glands depend on what type of cable is used and must

therefore be determined by the user. The cap nuts must be securely tightened. Tightening

the cap nuts too tight can have a negative effect on the protection class. The following

figures should be taken as rough guides only.

Type of cable glands

Installation torque cable glands

Plastic

2.5 Nm

Nickel plated brass

4.11 Nm

Stainless steel

4.11 Nm

Table 3.4Installation torque cable glands

Danger!
Check cable glands

The IP degree of protection can not be ensured if the cables and cable glands are not fitted

correctly.

To ensure the IP degree of protection

all screws of the housing / housing cover must have been tightened with the appropriate
torque,

only cables of the appropriate size must be used in the cable glands,

all cable glands must be tightened with the appropriate torque,

all seals must be undamaged and fitted correctly,

all empty cable glands must be sealed with appropriate plugs.

Advertising