Power Break® II Switches

Chapter 1. Introduction

1-4 Switch Installation

Ensure that all accessory connections are secure. Line up
the bolt holes in the enclosure with the attachment points

on the switch, illustrated in Figures 3, 4 and 5, insert the

bolts and tighten. Use

nonmagnetic

material in the area

between the line and load terminals to support the switch.

Figure 3. Locations of the

1

/

4

–20 x

3

/

8

-inch deep screw inserts

for mounting the switch in equipment, 800–2000 A frames.

Figure 4. Locations of the

3

/

8

–16 x

7

/

16

-inch deep screw inserts

for mounting the switch in equipment, 2500–3000 A back-

connected frames.

Figure 5. Locations of the

3

/

4

-inch diameter through holes for

mounting the switch in equipment, 4000 A front-connected

frame.