3 trip unit setup, Power break® ii switches, 3 control unit setup – GE Industrial Solutions Power Break II Switches, 800-4000A Frames, 240-600Vac User Manual

Page 15: Chapter 2. operation

Advertising
background image

Power Break® II Switches

Chapter 2. Operation

Figure 9. Terminal block mounted on the right side of the

switch.

Terminal Terminal

7

18 Motor Operator +

36 Motor Operator –

17 Remote

Charge

35

Remote

Charge

16 Remote Close +

34 Remote Close –

15 Bell Alarm only Com

33 Charge Indicator

14 Bell Alarm only NO

32 Shunt Trip

13 Bell Alarm only NC

31 Shunt Trip

12 Lockout Common

30 Undervoltage Release

11 Lockout NO

29 Undervoltage Release

10 Lockout

NC

28 Reserved

9 Reserved

27 Reserved

8

Reserved

26 Zone-Select Input –

7

commnet –

25 Zone-Select Input +

6

commnet +

24 Zone-Select Output –

5

C Phase Volts

23 Zone-Select Output +

4

B Phase Volts

22 Draw-Out Switch

3

A Phase volts

21 Draw-Out Switch

2

24 Vdc –

20 N Tap

1 24

Vdc

+

19 N Common

Do not apply voltage; see wiring diagram.

Not a user connection.

Table 4. Accessory connections to the right-side terminal block

B.

2-3 Control Unit Setup

See DEH–40381 for detailed instructions on setting up

Power+ Control Units.