3 trip unit setup, Power break® ii switches, 3 control unit setup – GE Industrial Solutions Power Break II Switches, 800-4000A Frames, 240-600Vac User Manual
Page 15: Chapter 2. operation
Power Break® II Switches
Chapter 2. Operation
Figure 9. Terminal block mounted on the right side of the
switch.
Terminal Terminal
7
18 Motor Operator +
36 Motor Operator –
17 Remote
Charge
35
Remote
Charge
16 Remote Close +
34 Remote Close –
15 Bell Alarm only Com
33 Charge Indicator
14 Bell Alarm only NO
32 Shunt Trip
13 Bell Alarm only NC
31 Shunt Trip
12 Lockout Common
30 Undervoltage Release
11 Lockout NO
29 Undervoltage Release
10 Lockout
NC
28 Reserved
9 Reserved
27 Reserved
8
Reserved
26 Zone-Select Input –
7
commnet –
25 Zone-Select Input +
6
commnet +
24 Zone-Select Output –
5
C Phase Volts
23 Zone-Select Output +
4
B Phase Volts
22 Draw-Out Switch
3
A Phase volts
21 Draw-Out Switch
2
24 Vdc –
20 N Tap
1 24
Vdc
+
19 N Common
Do not apply voltage; see wiring diagram.
Not a user connection.
Table 4. Accessory connections to the right-side terminal block
B.
2-3 Control Unit Setup
See DEH–40381 for detailed instructions on setting up
Power+ Control Units.