EntelliGuard R Circuit Breaker Retrofill AKD-6 Installation Manual DEH-41548 02/12

Figure 7. Bus, Interior View

Unpack Retrofill Circuit Breaker

By following the procedures below, you should be able to install the breaker with minimum effort and time.

Turn off all power to switchgear. Tagout

and lockout main source, up-stream or main

breaker.

Failure to comply with these instructions will

result in death or serious injury from severe burns

caused by arc flashing that has exceedingly high

temperatures.

Always wear personal protection equipment

according to OSHA standards and appropriate

to the severity of potential burns.

Ensure only qualified personnel install, operate, service, and maintain all electrical

equipment.