36

EntelliGuard R Circuit Breaker Retrofill AKD-6 Installation Manual DEH-41548 02/12

Install 19-Pin Programmer Secondary Disconnect (Compartment)

It must be ensured that the supply power to

the compartment is turned off/ compartment is
de-energized for all the incoming and outgoing
circuits of the LVS prior to any work being
conducted on it.

During the installation and related work on the
equipment, it must be ensured that the operator
is using the prescribed PPE for the specified tasks.

Ensure only qualified personnel install, operate, service, and maintain all electrical equipment.

• Installing the programmer disconnect should not be carried out when the compartment is live.

• The compartment should be de-energized before the installing the programmer disconnect assembly.
NOTE: 12-Pin Programmer disconnect configuration is not provided with the AKD6 version of the Retrofils of the
EntelliGuard ACB.

To install the programmer disconnect in the AKD-6 switchgear, do the following:

1. Turn off power to the switchgear, if not done already.
2. Have these tools ready for doing the task: hand-drill, cleaning solution, antirust, and wrench for metric M6

bolt/nut.

3. Clean the base of the compartment of any dirt or foreign particles, if not done already.
4. Slide the inner frame assembly to its maximum inserted condition (

Figure 29

).

5. This position corresponds to the frame position when the breaker would be in, fully connected.
6. Use the slot, inner semicircle as a datum reference and mark the mounting-hole locations using the template

shown in (

Figure 29

). Dimensions shown are in inches.

7. Drill ¼-inch diameter holes at 4 locations as marked.