Install or Insert AKD-6 Retrofill

It must be ensured that the supply power to the

compartment is turned off/ compartment is

de-energized for all the incoming and outgoing

circuits of the LVS prior to any work being

conducted on it.

During the installation and related work on

the equipment, it must be ensured that the

operator is using the prescribed PPE for the

specified tasks.

Ensure only qualified personnel install, operate, service, and maintain all electrical equipment.

After the existing breaker is removed, the pre-wired retrofill breaker can now be installed in the AKD-6 switchgear.
1. Verify that the breaker is in the disconnected, switched-off position before mounting it on rails.
2. Pull out the cubicle rails, horizontal to the ground.
3. While rotating the lever (away from the cubicle) at the end of each rail, which unlocks the inner rail, pull the rail

assemblies outwards to their fully extended positions. The rails can now support and secure the retrofill
breaker in the switchgear (