GE Industrial Solutions Power-Vac ML-20 Mechanism User Manual

Page 35

Advertising
background image

35

TABLE 2 MEASUREMENTS

ITEM

BREAKER

CL. SPRING

OP. SPRING

MEASUREMENT

PG.

CONTACT

WIPE

OPEN

CLOSED

CHARGED
CHARGED

DISCHARGED

CHARGED

MEASURED BETWEEN BELLVILLE

WASHER AND TRUNION

23

CONTACT

GAP

OPEN

CLOSED

CHARGED
CHARGED

DISCHARGED

CHARGED

MEASURE THE TRAVEL OF THE

OPERATING ROD INSULATOR

23

CONTACT

EROSION

CLOSED

DISCHARGED

CHARGED

INDICATION ONLY

10

TRIP

COIL

CLOSED

DISCHARGED

CHARGED

MEASURE BETWEEN PLUNGER

BUTTON AND COIL HOUSING

12

CLOSE

COIL

OPEN

CHARGED

DISCHARGED

MEASURE BETWEEN PLUNGER

BUTTON AND COIL HOUSING

12

CONTROL

SWITCHES

OPEN

DISCHARGED

DISCHARGED

DEPENDS ON SWITCH TYPE

SEE SECTION 8.6

12

TIMING

SEE SECTION 12

19

CONTACT

SPEEDS

SEE SECTION 13

20



TABLE 3 ADJUSTMENTS

ITEM

BREAKER

CL. SPRING

OP. SPRING

MEASUREMENT

PG.

CONTACT

WIPE

CLOSED

CHARGED

CHARGED

ADJUST OPERATING ROD TO

OBTAIN REQUIRED DIMENSION

23

CONTACT

GAP

OPEN

DISCHARGED

DISCHARGED

ADVANCE OR RETARD GAP

ADJUSTING NUTS TO SET GAP

23

CONTACT

EROSION

CLOSED

DISCHARGED

CHARGED

ALIGN REFERENCE TAB WITH

BAND ON INTERRUPTER ROD-

NEW UNITS ONLY

10

TRIP

COIL

CLOSED

DISCHARGED

CHARGED

TURN ADJUSTING NUT TO OBTAIN

REQUIRED DIMENSION

23

CLOSE

COIL

OPEN

CHARGED

DISCHARGED

TURN ADJUSTING NUT TO OBTAIN

REQUIRED DIMENSION

24

CONTROL

SWITCHES

OPEN

DISCHARGED

DISCHARGED

ADJUST MOUNTING BRACKET TO

OBTAIN REQUIRED DIMENSION

12

OVER-

TRAVEL

STOP

OPEN

DISCHARGED

DISCHARGED

SEE SECTION 16.3, ITEM 4 FOR

ADJUSTMENT

23

Advertising