GE Industrial Solutions LP 33 Series 50 & 60 kVA Operating Manual User Manual

Page 42

Advertising
background image

Modifications reserved

Page 42/57

OPM_LPS_3UO_50K_60K_0US_V010.doc

Operating Manual LP 33 Series 50 & 60 kVA

7.1.6 Restore to normal operation after “EPO – Emergency Power Off”

NOTE !

Make sure about UPS status with “EPO” activate of, & Q1 closed, Q2 open and the
battery breaker Q3
in ON in battery cabinet.



View of the panel after pressing the button “EPO”:

x

All Contactors are open.

x

Booster, inverter and Static-Switch shutdown.

LP 33 60kVA

APPLICAT. SUPPLY OFF

= 0%




1. Reset

the

buttonEPO”.

Press Alarm, to reset alarm and buzzer.

01.06.2007 12:15:45
NR=255 Status=A588

4563:

EMERGENCY OFF

ACTIVATED

2.

Reset the UPS by entering the screen:

MENU/COMMAND MENU/INVERTER OFF

COMMAND MENU

INVERTER ON *
INVERTER OFF

The load is supplied by the mains through the automatic
bypass
.
The booster starts automatically.

The LCD screen must display the status:

APPLICATION ON BYPASS

LP 33 60kVA
APPLICATION ON BYPASS

= xx%

3.

Switch ON the inverter by entering the screen:

MENU/COMMAND MENU/INVERTER ON

COMMAND MENU

INVERTER ON *
INVERTER OFF

The load will be automatically transferred from mains to the
inverter.

The LCD screen must display the status:

APPLICATION ON UPS

LP 33 60kVA

APPLICATION ON UPS

= xx%

END OF PROCEDURE

Advertising