GE Industrial Solutions LP 33 Series 50 & 60 kVA Operating Manual User Manual

Page 50

Advertising
background image

Modifications reserved

Page 50/57

OPM_LPS_3UO_50K_60K_0US_V010.doc

Operating Manual LP 33 Series 50 & 60 kVA

7.2.6

Complete shutdown of a parallel system

As a result of this procedure the parallel system is completely switched OFF and not powered.

NOTE !

This procedure involves all equipment powered by parallel system, to be shut down.


1.

Perform the command total off on any one of the units.

2.

Switch OFF the output switch Q1 (Pos. 0) on each unit.

3.

Switch OFF battery breaker from battery cabinets of all units.

4. In order to discharge the DC link capacitors, start once more

the inverter on each unit through the screen:

MENU/COMMAND MENU/INVERTER ON

COMMAND MENU

INVERTER ON *
INVERTER OFF

Remark: command

INVERTER ON will be enabled only when

the inverter voltage of each phase decreases
below 7 VAC (about 30 seconds).

INVERTER: U1=

7V

U2= 7V U3= 7V
Frequency = 60.0Hz

Synchronized

Before proceeding to step 5, check on the display panel that
the DC link voltage (both polarities) Udcp and Udcn has reached
the minimum voltage of 5 VDC (about 30 seconds).

Udcp= 5V Udcn=

5V

Ubp=0V

Ubn=0V O

Charge level

=

0%

Autonomy =

0min


5. Switch OFF the inverter on each unit entering the screen:

MENU/COMMAND MENU/INVERTER OFF

MENU COMANDI

INVERTER ON
INVERTER OFF *


6. Switch OFF the mains power of each unit at the AC input distribution panel.

END OF PROCEDURE


CAUTION !

If the above procedure is not completely performed, it could cause
serious damages to the UPS.

WARNING !

If DC link capacitors not discharged as described in step “4 - discharge DC link
capacitors”, the DC link capacitors requires about 15 minutes to discharge
completely.
Wait until capacitors are completely discharged before starting the UPS again.

Apart from the front door, do not open any other part of the UPS.