Operating Manual LP 33 Series 50 & 60 kVA

7.2

PROCEDURES FOR PARALLEL SYSTEM LP 33 Series



7.2.1

Parallel System start-up of the LP 33 Series

Before connecting hazardous voltages, make sure that:
x The connection to the electrical system has been performed by qualified personnel;
x The equipment frame has been correctly grounded to the main earth;
x Make sure that mains input protection is removed;
x All the panels removed to allow the UPS connection have been correctly reinstalled;
x The UPS switches Q1 and Q2 are OFF (Pos. 0);
x The battery breaker Q3 in OFF.


This procedure must be performed for the first start-up following the installation, with all the units
completely switched Off and not powered.

This procedure presupposes that the load is not yet supplied by the UPS system.

NOTE !

The UPS can be started-up using the battery supply in case the input mains should be
unavailable.

To avoid an incidental battery discharge, it is recommended to proceed to the UPS
start-up having the input mains
available.




1. Switch ON the mains power for each unit at the input

distribution panel.

As a result each unit performs a self-test and the LCD will show
the following screen:

EXECUTING MAINBOARD

SELF TEST

00000000000
SELF TEST OK!

The LCD screen will display the number of the unit in the parallel
system (P1, P2, P3 or P4).

NOTE !

In case the alarm “4410 - Mains bypass out of
tolerance”
persists, please contact your Service
Center
.

2.

Turn ON battery breaker in all battery cabinets.

Continue