6 unpacking, Unpacking – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Installation Guide User Manual

Page 16

Advertising
background image

3.6 UNPACKING


The UPS and Battery Cabinets may be shipped packaged in carton boxes or in wooden crates (if
requested).

Move the cabinets as close as possible to the final location before removing from the pallet.

If delivered in a wooden crate, remove the cabinet from the pallet with care, because of the heavy
weight of the equipment.


NOTE !

Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to mains
or battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.



For parallel systems, the delivery also includes the bus control cables for inter-
connecting the UPS modules.



Packing material recycling
GE
, in compliance with environment protection, use only environmentally friendly
material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

Modifications reserved

Page 16/37

OPM_SGS_ISG_M10_M15_0US_V040.doc

Installation Guide SG Series 100 –120 – 150 kVA

Advertising