This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.

In case of 3-wire utility input the following solutions are possible:
1- Connection of a “3-wire kit” between Utility Input and Neutral of the output

transformer.
Attention:

With this configuration, load can only be connected phase-phase.
Absolutely no load connection permitted to the Neutral of the
output transformer.

In a RPA configuration with 3-wire kit,
it’s most important to connect the
Neutrals of the UPS outputs together
(see Fig .3.8.3-2).


Cable section for this connection shall
be not less then AWG 1.

Fig. 3.8.3-2 3-wire kit for RPA Parallel System

2- Bypass

transformer.

In this case the Neutral of wye secondary winding must be connected to the
Neutral of the output transformer.

Contact your Service Center for additional solutions.


Notices for installation

SGT500

0_100-1

50_UPS

BR1-2-

3_01

BR2

BR1

J2

3

4

2

4

1

1

2

3

Q1

Q2

Q2

BR3

Fig. 3.8.3-2 AC bus bars BR1, BR2 and BR3

For separate Bypass and Rectifier input configuration AC bus bars BR1, BR2 and BR3 MUST BE
REMOVED
.