3.8.2 Power connection with common input utility

LOAD

SGT

5000_100-

150

_U

PS conn

e

c

ti

o

n

com

m

on_GE_0

1

US

RECTIFIER & BYPASS

PE

PE

L3

-1

L2-

1

L1-

1

N

L1

N

L2

L3

1 - INPUT

Fig. 3.8.2-1 Power connections Common Input Utility

Common Input Rectifier / Bypass

L1-1

Rectifier + Bypass Phase A

L2-1

Rectifier + Bypass Phase B

L3-1

Rectifier + Bypass Phase C

N

PE

Neutral

Ground

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE

Load Neutral

Load Ground

Bus bars BR1, BR2 and BR3 MUST REMAIN CONNECTED.
Cable terminations are to the Rectifier Input Lugs and Output Lugs as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for input/output and DC power connections on Bus Bars: see Section 3.8.1.

NOTE !

This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.