2 parallel control bus connection, Parallel control bus connection, Ups 1 ups 2 ups 3 – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Installation Guide User Manual

Page 29

Advertising
background image

3.9.2 Parallel control bus connection

In cases of parallel operation, the communication between the units takes place through the control
bus cables
.

Each parallel unit is equipped with an additional board “P13 RPA Board where the connectors J52 (A)
and J62 (B) are located.
A short control cable provided with a ferrite ring core links the parallel board “P13 – RPA Board with the
parallel bus socket on which must be connected the control bus cables JA and JB on PCB P34 – Bus
Interface
.
All the parallel units are connected to the same control bus.

This connection allows:

The microprocessors of each unit to communicate with each other.

The oscillators of each unit to be locked together.

The regulation loops to compare the output current of each unit in order to equally share the load
current.


For increased reliability, this connection is made with redundant cables.
In this way, communication is maintained between units in case one of the control cables should fail or
be accidentally damaged or disconnected.

The standard length of the control bus cable between two parallel unit is 40 ft / 12 m.
Maximal overall length of bus connection, between the first and the last unit, should not be longer than

276 ft / 84 m.
Verify that control wiring is run in individual separate steel conduit.

NOTE !

Under no circumstance should the control bus cable connecting JA (1/2/3/4/5/6/7) and
JB (1/2/3/4/5/6/7)
be connected or disconnected after the system has been powered On.

S

G

T

500

0_1

00-

150

_R

P

A

-IM

0048_01

JP3

JP1

JP4

IM 0048

JP2

JP1

JP2

JP4

JP3

JB1

JA1

JB1

JA1

JP2

JP1

JP3

JP4

JP3

JP2

JP1

JP4

IM 0048

JP1

JP2

JB2

JB2

JA2

JA2

JA3

JB3

JP4

JP3

JP3

JP2

JP1

JP4

IM 0048

JA1 + JB1

JA2 + JB2

JA3 + JB3

UPS 1

UPS 2

UPS 3

Next parallel
unit 4,5,6,7,8

Fig. 3.9.2-1 RPA System - Control bus connection


The shield of the control bus cable, connected on JA and JB must be connected to ground with the
appropriate cable clamps fitted on parallel bus socket.

It is important to place the units in sequence of their assigned number.

A unit number from 1 to 8, is defined by the setting of parameters and displayed on the panel.
This number is also marked inside and outside the packaging.

Modifications reserved

Page 29/37

OPM_SGS_ISG_M10_M15_0US_V040.doc

Installation Guide SG Series 100 –120 – 150 kVA

Advertising