3 power connection dual input utility, Power connection dual input utility – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Installation Guide User Manual

Page 24

Advertising
background image

3.8.3 Power connection dual input utility

LOAD

SGT

500

0_1

00-

150

_U

PS c

onne

cti

on

sepa

ra

te_G

E_01

US

1 - INPUT RECTIFIER

2 - INPUT BYPASS

L1-2

L2-2

L3-2

PE

PE

L3-1

L2-1

L1-1

N - Byp

ass

L1

N

L2

L3

Fig. 3.8.3-1 Power connections Dual Input Utility

Dual Input Configuration Rectifier / Bypass

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

PE

N - Bypass

Bypass Neutral

Ground
For dual input configurations, a neutral conductor is required from the bypass source only.
The interconnection links BR1
, BR2 and BR3 MUST BE REMOVED (see Fig. 3.8.3-2).

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE

Load Neutral

Load Ground

Cable terminations are to the Rectifier/Bypass Input Lugs and Load Output Lugs as shown above.
Connect wire to the Lugs using appropriate tools and appropriate torque.
Torque specification for Input/Output and DC power connections on Bus Bars: see Section 3.8.1.

NOTE !

This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.


Modifications reserved

Page 24/37

OPM_SGS_ISG_M10_M15_0US_V040.doc

Installation Guide SG Series 100 –120 – 150 kVA

Advertising