3 control bus cable location, Control bus cable location, Next parallel unit – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Installation Guide User Manual

Page 31

Advertising
background image

3.9.3 Control bus cable location

WARNING !

This operation must be performed by trained personnel before the initial start-up.

ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.


A

S

G

T

50

00

_10

0-

1

50

_RP

A c

o

nt

rol

bus cabl

e_01

3

1

3

4

2

4

1

2

Q1

Q2

Fig. 3.11-1 View electronic module on intermediate unit

Access to the control bus
connection.

The control bus connection
between parallel units must be
made on the front of the

electronic module fitted behind
the front doors.

To properly route the control

bus cables the safety screen “A
must be removed.

S

G

T

5000_100-150_

RP

A cont

rol

b

u

s

ca

b

le

_02U

S

JB2

JB1

JA2

JA1

A

A

JA

JB

Next parallel unit

Fig. 3.11-2 Front view electronic module on intermediate unit

Control bus cables connection.

• Plug the cables JA (1/2/3/4/5/6/7) and

JB (1/2/3/4/5/6/7) onto the RJ
connectors JA and JB located on
parallel bus PCB P34 – Bus Interface
(going to “P13 – RPA Board” J52(A) and
J62(B).

• Fix both cables JA (1/2/3/4/5/6/7) and

JB (1/2/3/4/5/6/7) to parallel bus
socket connecting the cable shield to
ground by means the cable clamps

A“.

Modifications reserved

Page 31/37

OPM_SGS_ISG_M10_M15_0US_V040.doc

Installation Guide SG Series 100 –120 – 150 kVA

Advertising