Ups 1 ups 2, Service center, Control bus cables routing – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Installation Guide User Manual

Page 32

Advertising
background image

SGT

5000

_100

-1

50_R

P

A

con

trol

b

u

s

cable_03US

UPS 1

UPS 2

Next parallel

JB1

JA1

JB

JA

JA2

JA

JB2

JA1

JB1

JB

unit 3, 4, 5,

JB2

JA2

JA1

JB1

6, 7, 8

3

1

3

4

2

4

1

2

3

4

2

1

3

2

1

4

Q2

Q1

Q2

Q1

Fig. 3.11-3 Control Bus cable routing and connection

Control bus cables routing

Place and fix the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 inside the UPS cabinets in the
position illustrated in the drawing.


NOTE !

Pay attention when cabling and routing the bus cables JA and JB inside the UPS
cabinet.
In case one unit should be removed from the parallel system, the bus cables JA
and
JB
must be removed from the cabinet without disconnecting them from the metal
plate where the sockets JA
and JB are located.

For reliability reasons the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 connecting the units should
be run in separated protected conduits (as indicated in Fig. 3.9.3-3) separated from the power
cables.

It is important that the cable JA must be the same length as cable JB.


WARNING !

Connection and commissioning of an additional UPS to an existing parallel system,
must be performed by a service engineer from of your

Service Center.

Modifications reserved

Page 32/37

OPM_SGS_ISG_M10_M15_0US_V040.doc

Installation Guide SG Series 100 –120 – 150 kVA

Advertising