2 layout, 1 layout sg series 100 - 120 - 150 kva, Layout – GE Industrial Solutions SG Series 100 – 120 – 150 kVA Installation Guide User Manual
Page 9: Layout sg series 100 - 120 - 150 kva
2 LAYOUT
2.1 LAYOUT SG Series 100 - 120 - 150 kVA
SG
T50
00
_10
0-
15
0_
U
P
S
_
G
E
0
2
Fig. 2.1-1 SG Series general view
S
GT
5
00
0
1
00
-15
0
U
P
S
0
3
Modifications reserved
Page 9/37
OPM_SGS_ISG_M10_M15_0US_V040.doc
Installation Guide SG Series 100 –120 – 150 kVA
J2
2
4
3
1
4
3
2
1
Q2
Q1
Fig. 2.1-2 SG Series general view with open doors
S
G
T
50
00
_1
00-
150
_U
P
S
_
04
3
2
PA
CR
XB
1
4
Q1
2
4
3
1
4
3
2
1
XA
Q2
Fig. 2.1-3 SG Series general view with optional 5
th
harmonic filter
and removed protection panels
1
Opening for top cable entry
2
Opening for bottom cable entry
3
Compression lugs for Utility input
and Load output
4 Compression lugs for external
Battery connection
CR Connectivity
Rack
PA 24VDC Auxiliary Power Supply
XA Terminals for 24VDC Auxiliary
Power Supply connection
XB Terminals for EPO connection