GE Industrial Solutions GERAPID 2508, 4008, 5008, 6008 WITH ARC CHUTE 1X2 User Manual

Page 43

Advertising
background image

2011-03-14 S47183De rev.01

Design and specifications are subject to change without notice

43

6. Inspections and maintenance

6.1 List of inspections

TYPE OF THE
INSPECTION

BY WHOM

HOW OFTEN

WHAT TO DO/CHECK

A.

General visual

inspection

-Customer
-Trained technician

Every 6-12 months

 Check for damages or cracks of the frame,

adapter or arc chute

 Check for missing screws or caps
 Check for damaged labels
 Check for corrosion
 Check for distinct manifestations of flame or

smoke at the frame

 Clean the breaker from dirt and dust
 Clean and degrease the copper terminals

B.

General functional

inspection

-Customer

-Trained technician

Every 6-12 months

Manually close and open the breaker to
check the drive and mechanism

Close the breaker electrically and open by

trip unit(s) releasing, to check controls

C.

Inspection of the arc

chute and contact
system

-Customer

-Trained technician

Every 6-12 months

or

after:

high short circuit
opening at >25 kA

>300 openings at load

current

>100 openings at over
current load (2-3 x In)

It is recommend to carry

out inspection of contact

system after breaking of

equivalent of 150MA

2

s total

let through energy.

Check for wear of the arc runners; shall

not exceed 30 % of its cross section

Check for wear of the pre-arcing contact.
It shall not exceed 2 mm [0.08 in].

Check for wear of the main contacts at
fixed and flexible sides; shall not exceed

1.5 mm [0.06 in] of its depth.

Check for wear of the arc chute plates;
check for deposits inside of arc chute, this

area shall be free of deposits.

Check for wear of protective walls; shall

not exceed 1 mm [0.04 in].

Check for contact tilt and gaps.

D.

Inspection of the

screw/bolt connections

-Customer

-Trained technician

Every 6-12 months

or

after every inspection:

of the arc runners

of the contacts

of the arc chute

Check the position of the countersunk screws

in the sidewalls.
Check for tightness or use torque tool (torque

in SI and Imperial units):

M8 ~20 Nm [~ 177 in-lbs]

M6 ~10 Nm [~ 88 in-lbs]

M5 ~5 Nm [~ 44 in-lbs]

M4 ~3 Nm [~ 26 in-lbs]

E.

Inspection of the

mechanic components

-GE

-Service technician

Every 5 years

or
After 5.000 openings

Carry out inspection “B” above

Check out settings of the main contacts
and auxiliary switch

Check out main flexband breakage; shall

not exceed 30 % of its cross section

Check out wear of mini flexband; shall not
exceed 30 % of its cross section

Clean and degrease UVR latch and quick
latch of the mechanism. Apply dash of

Beacon EP2 grease afterwards.


Required tools:
Cleaning tissue; abrasive paper; manual closing lever; hexagon wrenches SW5, SW6; Torx® wrenches size 30, 40, 45; small and
medium screwdrivers; ratchet with 10 mm hex cap; pliers; tongs.

Dispose of the breakers if required:
Pay attention to the national and local regulations of disposal!

Advertising