6.2.2 Layout of control PCB inside control box

Fig. 53 Control box inside.

Slot Control board

Z-No.

Orientation

1

-

-

-

2

NEKO unit (ED trip)

128 750 R1

equipment to left

3

Voltage converter

128 730 R2-R4 equipment to left

4

SU-control unit

128 700

equipment to right

5

-

-

-

6

ST/UVR control unit

128 710 R1, R2

equipment to left

Table 5 Layout of control PCBs inside the control box.

Fig. 54 Control box front view

Warning: The isolation plates between the control boards

and at the wall of the box must always be present!

Hint: In older systems, the control boards may be installed

turned 180 °!

6.2.4 Replacement of the control boards

1. OPEN the breaker.
2. Disconnect power supply, and pull out all
the plugs from control box’s terminals.
3. If a NEKO control unit is installed, wait 1
minute until capacitors discharge.

Fig. 55-1 Unscrew and remove all the external plugs

Fig. 55-2 Unscrew four bolts of the box cover

Fig. 55-3 Carefully lower the box cover