GE Industrial Solutions SG Series 50 & 80 kVA Installation Guide User Manual

Page 17

Advertising
background image

7.

Remove anchoring plate “E” from all
four legs and unscrew supporting

block screws “F”.

8.

Divide the supporting blocks with a

hammer and save blocks “G” and “H
for ramp supports.

F

SG Series 50 & 80 kVA

9.

Place blocks “G” and “H” and frames
B” and “C” under ramp for support.

10. Make sure leveling feet are raised

and carefully role UPS down ramp.


NOTE !

Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to mains
or battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.


For parallel systems, the delivery also includes the bus control cables for inter-
connecting the UPS modules.


Packing material recycling
GE
, in compliance with environment protection, use only environmentally friendly
material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

F

H

E

G

B

G

H

C

Modifications reserved

Page 17/38

OPM_SGS_ISG_50K_80K_0US_V040.doc

Installation Guide

Advertising