4 battery connection, Battery connection – GE Industrial Solutions SG Series 50 & 80 kVA Installation Guide User Manual

Page 27

Advertising
background image

3.8.4 Battery connection

S

G

T5

000

_05

0-08

0_UP

S

co

nne

ct

ion

battery_02

US

X3

+

PE

BATTERY

_

Fig. 3.8.4-1 Power connections battery

SG Series 50 & 80kVA Max.

rating

Battery terminals:

4/0 AWG (95mm

2

)

Battery

+

Positive pole of the Battery

Negative pole of the Battery

Do not insert the Battery Fuses before the commissioning.


Battery cable terminations are to the Positive and Negative Terminals as shown above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: see Section 3.8.1.

NOTE !

To meet standards concerning electromagnetic compliance, the connection
between the UPS and external battery must be done by using a shielded cable or
suitable shielded (metal) conduit!
This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer for, the secondary of the
transformer must be wye-configured with neutral solidly grounded.

Modifications reserved

Page 27/38

OPM_SGS_ISG_50K_80K_0US_V040.doc

Installation Guide SG Series 50 & 80 kVA

Advertising