3.8.3 Power connection dual input utility

S

GT

5

00

0_

05

0-

08

0_

UP

S

co

nn

ec

ti

o

n

separate_02US

OF
F

ON

ON

OF
F

LOAD

INPUT
RECTIFIER

1 -

PE

L1-1

X1

L1

L2

L3

N

PE

L2-1

L3-1

N - Bypass

X2

2- IN

PU

T

B

Y

P

ASS

L1-2

L2-2

L3-2

L3

L2

L1

Fig. 3.8.3-1 Power connections Dual Input Utility

SG Series 50 & 80 kVA Max.

rating

X1 and X2 terminals:

4/0 AWG (95mm

2

)

Dual Input Configuration Rectifier / Bypass

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

PE

N - Bypass

Bypass Neutral

Ground
For dual input configurations, a neutral conductor is required from the bypass source only.
The interconnection links BR1
, BR2 and BR3 MUST BE REMOVED (see Fig. 3.8.3-2).

Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

PE

Load Neutral

Load Ground


Cable terminations are to the Rectifier / Bypass Input Terminals and Load Output Terminals as shown
above.
Connect wire to the Terminals using appropriate tools and appropriate torque.
Torque specification for Input / Output and DC power connections on Terminals: see Section 3.8.1.

NOTE !

This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input transformer, the secondary of the transformer
must be wye-configured with neutral solidly grounded.


Modifications reserved