Da c b, Top entry cables bottom entry cables – GE Industrial Solutions SG Series 50 & 80 kVA Installation Guide User Manual

Page 23

Advertising
background image

How to access the terminals for the cable connections.

Top entry cables

Bottom entry cables

D

A

C

B

!

Please remove the plate "E & F"
before drilling any wholes.

E

F

SGUL_

030-04

0_UPS

connec

tion_01

US

Fig. 3.8.1-1 Access to the input / output connections

To access input, output and Battery connections proceed as follows:

• Remove protection panel “A”.
• Remove protection panel “B”.
• Remove UPS side panel “C”.
• Only for Dual Input Utility:

Remove with appropriate tool the metallic window “D” from the metal screen “C”.

Modifications reserved

Page 23/38

OPM_SGS_ISG_50K_80K_0US_V040.doc

Installation Guide SG Series 50 & 80 kVA

Advertising