How to access the terminals for the cable connections.
Top entry cables
Bottom entry cables
D
A
C
B
!
Please remove the plate "E & F"
before drilling any wholes.
E
F
SGUL_
030-04
0_UPS
connec
tion_01
US
Fig. 3.8.1-1 Access to the input / output connections
To access input, output and Battery connections proceed as follows:
• Remove protection panel “A”.
• Remove protection panel “B”.
• Remove UPS side panel “C”.
• Only for Dual Input Utility:
Remove with appropriate tool the metallic window “D” from the metal screen “C”.