3 control bus cable location, Control bus cable location, Next parallel unit – GE Industrial Solutions SG Series 50 & 80 kVA Installation Guide User Manual

Page 32: Access to the control bus connection

Advertising
background image

3.9.3 Control bus cable location

WARNING !

This operation must be performed by trained personnel before the initial start-up.

ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.


SGT

5000

_0

50

-0

80_R

PA c

on

tr

ol

b

us

c

abl

e_01b

Access to the control bus
connection.

Q1

OF
F

ON

Q2

ON

OF
F


The control bus connection
between parallel units must be
made on the front of the

electronic module fitted behind
the front doors.

Fig. 3.9.3-1 View electronic module on intermediate unit


SGT

5

0

00_1

00

-1

50

_RPA con

tr

o

l b

u

s

cable_

02US

JB2

JB1

JA2

JA1

A

A

JA

JB

Next parallel unit

Fig. 3.9.3-2 Front view electronic module on intermediate unit

Control bus cables connection.

• Plug the cables JA (1/2/3/4/5/6/7) and

JB (1/2/3/4/5/6/7) onto the RJ
connectors JA and JB located on
parallel bus PCB P34 – Bus Interface
(going to “P13 – RPA Board” J52(A) and
J62(B).

• Fix both cables JA (1/2/3/4/5/6/7) and

JB (1/2/3/4/5/6/7) to parallel bus
socket connecting the cable shield to
ground by means the cable clamps

A“.

Modifications reserved

Page 32/38

OPM_SGS_ISG_50K_80K_0US_V040.doc

Installation Guide SG Series 50 & 80 kVA

Advertising