1 serial port j3, 2 output free potential contacts, Serial port j3 – GE Industrial Solutions SG Series 50 & 80 kVA Installation Guide User Manual

Page 35: Output free potential contacts

Advertising
background image

4.1.1 Serial Port J3

4

4

1

3

2

3

2

1

SGT5000_100

-1

50_Custome

r i

n

terface

J

3_01

J3

Fig. 4.1.1-1 Serial port J3

Serial port J3 - RS-232 (sub D, female 9 pin) that allows:

Total remote management of the system using new generation software

JUMP (Java Universal Management Platform) for system protection and
management of systems using GE UPS.

JUMP system is written in JAVA and supports virtually all platforms having
JAVA runtime environment.

The serial port J3 - RS232 is enabled
on all the units of the parallel system.

Fig. 4.1.1-2 Serial port J3 connection to PC with RS232 1:1 cable DB9m – DB9f




4.1.2 Output free potential contacts

The interface board provides 6 voltage free relay contacts giving some UPS critical alarms and
operation mode.

These signals are available either on connector J2- (sub D, female 25 pin) or terminal blocks X1.

The meaning of the alarms on the free contacts in standard configuration (default) is the following:

X1 / 1, 2, 3

or

J2 / 1, 2, 3

(NO, C, NC)

Utility Failure

X1 / 4, 5, 6

or

J2 / 4, 5, 6

(NO, C, NC)

Load on Inverter

X1 / 7, 8, 9

or

J2 / 7, 8, 9

(NO, C, NC)

Stop Operations

X1 / 12, 13, 14

or

J2 / 14, 15, 16

(NO, C, NC)

Load on Utility

X1 / 15, 16, 17

or

J2 / 17, 18, 19

(NO, C, NC)

General Alarm

X1 / 18, 19, 20

J2 / 20, 21, 22

(NO, C, NC)

Acoustic Alarm

or


In case different alarms or operating status are required, they can be configured on the same terminals
via software from the control panel.

The configuration can be changed in parameters mode by a trained operator using the appropriate
password.

NOTE !

The programmable signals on X1 and J2 will be disabled with Q1 open, with the
exception of the signals for “16 - Manual Bypass ON”
and “26 - EPO”.

Modifications reserved

Page 35/38

OPM_SGS_ISG_50K_80K_0US_V040.doc