REV 7 ATRT-03, ATRT-03A, AND ATRT-03B USER’S MANUAL

82

4.2

Performing a Verification Test

Use the steps below to perform a verification test on the ATRT-03’s electronics:

a. Start from the “START-UP” menu:

Press the

[4]

key (DIAG).

b. The following screen will be displayed:

Press the

[2]

key (VERIFICATION TEST).

c. The following screen will be displayed:

Connect the H and X cables per the on-screen instructions and then press the

[ENTER]

key.

d. The ATRT-03 will start performing a DELTA-DELTA test. The following screen will be

displayed momentarily:

The screen will then be updated with the test results for each phase:

Press any key to continue. The unit will then proceed to perform a Y to Y test. The
following screen will be displayed momentarily:

RATIO mA % DIFF
+1.0000 0001
+1.0000 0001
+1.0000 0001

DELTA-DELTA TEST



VERIFICATION TEST
CONNECT:H0-X0, H1-X1
H2-X2, H3-X3
THEN “ENTER” KEY...

1.CABLE TEST
2.VERIFICATION TEST
3.AUTO-DETECT XFMR

1.TEST XFMR 08/23/10

2.SETUP 08:25:15
3.CALCULATOR
4.DIAG 5.QUICK TST