You can use NxDBU modules in any slot.

Power-up Testing

When shipped from the factory, the TSU 600 is set to factory default con-
ditions. At the first application of power, the unit automatically exe-
cutes a memory self-test. A full self-test can be run from the front panel,
and a passcode and unit ID may be set using the UTIL menu.

Self-Test

Upon a power-up, the LCD displays

Memory Test Now Testing

and the

Test LEDs are illuminated.

Slots 3-5

Slots 3-5 will accept any interface type except second-
ary interface, the interface for DTE timing, or the mul-
tiport DBU. If other interfaces have any restriction on
their location, this will be specified in the individual
option card manual (provided with the option cards).

Slot 6

Slot 6 services any option module type including sec-
ondary network interface ports (DSX-1 (PBX) and Full
D&I), but not the DTE timing source. If a secondary
network interface port is to be used, it must be
installed in slot 6.

When . . .

Then . . .

the self-test is complete
with no failures detected

the

OK LED

lights up and the LCD

momentarily displays

All Tests

Passed

.

a failure is detected

a list of failures is displayed in the
LCD window