Rhino Shelter DOMED-40W X 60L X 18H User Manual

Page 10

Advertising
background image

Base Plate along Sidewall. Use two Bolts M10x15(31) for

Assembly Instructions 40x60x18 Domed Style Truss Building

10

Version 3.1

Please DO NOT return unit to store or dealer. For all questions or shortages please contact

Customer Service at: 800-447-7079 or 203-877-7070

Figure 12 Frame installation for Front and Back Panel

Figure 13 Installation of Front and Back Wall



Step #6 – Wind Stabilizer Cables and Turnbuckles

SIDEWALL WIND STABALIZERS

On each side of frame assembly, cables with turnbuckle
adjustments are provided to align and strengthen frame
before installing cover. Turnbuckle & Cable (Part #42)
are to be placed in a ‘v’ pattern as shown on Figure 1 for
both sidewalls. Beginning at the base of arch #3 and #5,
attach the cables from the base to the upper end of
arches #2 & #4 and to Arches #4 and #6. After installing
all cables, tighten the turnbuckles slightly to adjust the
arches vertically and to add rigidity.

END ARCH STABALIZERS

On each end of frame assembly, cables with turnbuckle
adjustments are provided to align and strengthen frame
before installing cover. Turnbuckle & Cable (Part #42)
are to be placed from the Door Track Baseplate to the
upper corner of the Curved Tube (#3A). Install the
cables, and tighten the turnbuckles slightly to adjust the
arches vertically and to add rigidity

.

Figure 14 Position of Wind Stabilizers (turnbuckle and
steel wire) at the sidewall



Step #7 – Bolt Ratchets to Base Plates

Attach Tie Down Ratchet Assemblies (Part #32) to each

each sidewall ratchet to secure to Base.


MAIN COVER INSTALLATION

Step #8 – Prepare Frame and Position Main Cover

To elongate the life of Main Cover, put a small square of
duct tape (field supplied) over each bolt head on frame
that comes in contact with cover. The tape acts as a