Rhino Shelter DOMED-40W X 60L X 18H User Manual

Page 12

Advertising
background image

Assembly Instructions 40x60x18 Domed Style Truss Building

12

Version 3.1

Please DO NOT return unit to store or dealer. For all questions or shortages please contact

Customer Service at: 800-447-7079 or 203-877-7070

Figure 15 Fastening the Roof cover



Step #9 – Mount Tie Down Ratchets To Base Plates

When Main Cover is over top of Frame Assembly, insert
Tensioning Tubes (#20) into pockets along both sides of
Main Cover. Add Band for Tie Down Ratchet (#32) at
each point along the cover opening, over Tensioning
Tube as shown in Figure 11. Starting
with one side, insert Tie Down Bands (#32A) into Tie
Down Ratchet assemblies (#32), and remove slack. Do
Not Tighten down yet.



Step #10 – Tension Cover On Frame Side-To-Side

Center Main Cover over Frame assembly both side to
side and front to back. Next insert Tensioning Tube

Plastic Caps (Part #40) into the ends of the Tensioning
Tubes (Part #20) into the pockets in inside edge of Main
Cover on each side.


Align one side of Main Cover evenly front to back. Put
Band for Tie Down Ratchets (Part #32A) over
Tensioning Tubes (Part #20) at each Base Plate along
one side. Bands do not attach to Tensioning Tubes, but
loop around and secure at both ends on ratchet.

Next take up slack in tie bands by ratcheting the
mechanisms, tightening cover. Evenly adjust ratchets
on both sides of main cover to take wrinkles out of main
cover. DO NOT fully tighten cover yet. Leave adequate
slack so that cover can also be adjusted front to back in
next step.

Advertising