Rhino Shelter DOMED-40W X 60L X 18H User Manual

Page 2

Advertising
background image

your Big Bear Building. As the components fit into

installation of your new Big Bear building:

Assembly Instructions 40x60x18 Domed Style Truss Building

2

Version 3.1

Please DO NOT return unit to store or dealer. For all questions or shortages please contact

Customer Service at: 800-447-7079 or 203-877-7070

Figure 1 Overall Frame Assembly



TOOLS REQUIRED

The following hand tools will be needed for proper

12mm, 14mm, and 17mm Open End Wrenches,

12mm,14mm, 17mm Sockets or Box Wrench,

Large Flat Head Screwdriver,

2lb maul or Sledgehammer

4 Foot Level14’ Step Ladder

Stakes & String for aligning Base Plates & Frame





INVENTORY CHECK

Start installation procedure by removing all components
from packaging to ensure all components are present.
Inventory chart appears on the last page of this manual.



SITE SELECTION & PREPARATION

Select a level or as close to level as possible location for

each other as a level unit, there can be no more than 1.5
inches difference between one base Plate and another.
Time spent preparing the base will pay off in years of
good operation without binding of parts and doors.

The only suitable location is on top of a poured concrete
pad.


The unit should not be located under trees, which will
shed hard fruit such as apples, walnuts, or heavy pine
cones. The cover of your unit will protect against normal
falling leaves and light debris, however, large branches
or other falling items may cause a puncture or tear in the
cover material.

Take notice of drainage around your intended location.
Water draining from the surrounding terrain should be
planned so that it does not run into the unit. As well, rain
or melting snow that comes off the unit should be

Advertising