American Dryer Corp. Gas- DSI/Steam ML-82 II User Manual

Page 25

Advertising
background image

21

3. Electrical Connections

NOTE: A wire diagram is located in the front electrical control box for connection data.

a. Gas Models and Steam Models Only

NOTE: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.

For gas and steam dryers manufactured for operation
at 3-phase (3ø), the electrical connections are made
at the power distribution block located in the service
box at the rear, upper left hand corner of the dryer. To
gain access to the service box and contactor, the service
box cover must be removed.

Providing local codes permit, power to the dryer can be
made by the use of a flexible U.L. listed cord or pigtail
(wire size must conform to the rating of the dryer), or the
dryer can be hard wired directly to the service breaker. In
ALL cases, a strain relief should be used both where the
wiring enters the dryer and the service box.

Advertising