American Dryer Corp. Gas- DSI/Steam ML-82 II User Manual

Page 33

Advertising
background image

29

5. Steam Damper Air Piston (Flow Control) Operation Adjustment

Although the damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bars), steam
damper operation must be checked before the dryer is put into operation. Refer to page 31 for instructions
to check steam damper operation. If damper air adjustment is necessary, locate flow control valve and
make necessary adjustments as noted below.

Advertising