Appendix G-2 Turbine Installation QA Checklist

NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this

document.


DOC012R02 AOC 15/50 User Manual Nov 2001

153


Tip Brake Installation

Check

Ensure tip brake slides into blade end without obstruction

Tip brake cables properly attached to connector points

Ensure installation of low-profile washers

Torque 5/16 mounting nuts to 11 ft/lbs

Torque 3/8" studs to 18 ft/lbs

Perform tip brake pull test

Assy by

Q.A.

Date

Installing Turbine

Check

Tower top bolts torqued to 600 ft/lbs

Confirm free yaw with yaw lock disengaged

Install twist cables into twist cable junction box

Install anemometer assembly at proscribed location on tower

Assy by

Q.A.

Date

QA approval signature

Date