HP 9000 Virtual Library System User Manual

Page 216

Advertising
background image

Cartridges configured

Automigration configuration

Host LUN mapping configuration

7.

Power up all secondary nodes. The boot up can take 10 to 20 minutes.

8.

Verify all secondary nodes.

At this point, your VLS system is up and in working order. Do not connect the old primary
node to the VLS because its configuration will be out of sync with the system.

9.

Repair the old primary node and then Quick Restore it; do not configure the node after the
Quick Restore. Power down the old node and keep it as the cold spare.

NOTE:

If your primary node failed within an hour of making a configuration change, your most

recent change may not be reinstated on the spare node. Check your configuration settings and
reconfigure as needed.

216

Disaster Recovery

Advertising
This manual is related to the following products: