HP 9000 Virtual Library System User Manual

Page 39

Advertising
background image

5.

From the front of the rack, secure the adjustable mounting flanges to the marked holes, using
screws shipped with the rails.

6.

From the rear of the rack, slide the racking shelf assembly with Fibre Channel switch into the
rack, sliding the rail ends onto the adjustable mounting flanges already installed in the front
rack vertical posts.

7.

When the rail flanges are flush with the rack vertical posts, secure them to the rack.

8.

Attach two 1U cover plates to the front of the rack.

Attach one 1U cover plate in front of each Fibre Channel switch.

9.

Plug the AC power cords into an AC power source.

Route one cord to a PDM mounted on the right vertical post, and the other to a PDM on the
left vertical post.

10. Repeat this procedure to install the second Fibre Channel switch in rack position 42.

Installing the Fibre Channel Switches into a Rack

39

Advertising
This manual is related to the following products: