AT&T 76450 User Manual

Page 30

Advertising
background image

Common Systems Connection Standards AT&T Services, Inc
Date: June 2013

ATT-TP-76450, Issue 15

Copyright

©

2013, AT&T . All Rights Reserved.

Page 30

9.4

Process:


Requirements marked “Yes” for compliance will require no further action.

Requirements marked “No” for non-compliance will trigger the AT&T SME for the requirement
to contact the manufacturer in an effort to resolve the non-compliance. All issues must be
resolved before the equipment is approved for use in AT&T.

Footnote references for requirements marked “N/A” for not applicable or “Part” for partially
compliant will be reviewed by the AT&T SME for that requirement. The SME may initiate
contact with the vendor for further clarification and/or resolution.

When compliance/resolution to all requirements is met, the ATT-TP 76450 SPOC will notify the
AT&T Product Manager for the equipment that it is compliant.

Forward the completed checklist and supporting documentation as required in Section 7.3 to:


John Tablerion
15248 S. Ravinia
Orland Park Ill. 60462
Office: 708-403-4450
Fax: 708-460-4457
Email:

[email protected]

Advertising