Vertical contact toaster, Maintenance (continued) – A.J. Antunes & Co VCT-20 9200552 User Manual

Page 14

Advertising
background image

14

VERTICAL CONTACT TOASTER

P/N 1010719 Rev. E 02/13

Figure 11. Removing Belt Wrap

Belt Wrap Pin

Conveyor

Cover Assy.

Interlock

Switch

NOTE: Check the release sheet to make sure it is

not caught in the conveyor. Additional release

sheets can be obtained through your authorized

service agency under part no. 7000110 (3 pack) or

7000111 (10 pack).

Replacing Belt Wraps

1. Turn off rocker switch, unplug the power cord and

allow the unit to cool down before proceeding.

2. Remove the Heat Shield, Front Conveyor Cover,

Rear Conveyor Cover, Bun Chute and Release

Sheet.

3. Turn bun compression Control Knobs to “6”

(Figure 6).

4. Move belt wraps until connecting hinge is

exposed and centered, then remove both front

and rear belt wraps (Figure 11).

5. The belt wraps must be installed properly in order

to work correctly (Figure 12).

CAUTION

Figure 12. Installing Belt Wrap

Figure 13. Aligning Belt Teeth

Belt Wrap

Pin

Belt Rotation

Upper Support Rod

Lower Support Rod

6. Install the belt wraps as shown in Figures 12 &

13.

7. Set bun compression control knobs to “6”

(Figure 6).

8. Install a new release sheet (Figure 11).

9. Install the front conveyor cover and rear conveyor

cover.

10. Push the cover so the top cover slots slide over

the top conveyor support rods and latch into

place.

11. Install bun chute and heat shield.

MAINTENANCE (continued)

CAUTION

Be sure conveyor belt wrap is positioned UNDER

the upper and lower support rods or damage to

the unit will occur.

CAUTION

Be sure conveyor belt wrap ends are aligned as

shown in Figure 13 or damage to the conveyor

belt wrap will occur.

INCORRECT

CORRECT

Advertising
This manual is related to the following products: