Main hydraulic block fitting and hose access – Hawk Industries Hawkjaw Sr. Manual 100K-2GSR Serial Numbers 121 to 140 User Manual

Page 67

Advertising
background image

Tools Required

3/4" wrench, 3/16" Allen wrench

Initial Steps

1. Make sure the HawkJaw is off

the drill pipe connection and in

the rest position on the derrick.

2. Shut down the Hydraulic

power unit.

3. Press the Grip button

repeatedly to bleed hydraulic

pressure.

4. Disconnect the Air power

supply.

5. Push in the “E” stop (E).

6. Assume that there is still a load

on every actuator. Proceed with

caution.

Spinner Motor Sequence

Valve

1. Use the 3/4" wrench to remove

the Sequence Valve Cover Bolts

(B) and Cover (C).

2. The Sequence Valve is located

within the Sequence Valve

Rubber Sleeve (S).

Changing All Other

HawkJaw Parts

66 Maintenance & Repair

E

Main Hydraulic Block Fitting and Hose Access

S

B

C

Advertising