Installation, Installation -6 – JLG T350 Service Manual User Manual

Page 138

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-6

– JLG Lift –

3121198

9. Install the bolt, keeper pin, and upper pivot pin

securing the platform pivot to the boom.

10. Install the bolt, keeper pin, and lower pivot pin

securing the platform pivot to the boom.

Installation

1. Lift the boom into position on the machine. Install

the pivot pin, keeper pin, and bolt securing the
boom to the turntable.

NOTE: The main boom weighs approximately 626 lbs. (284

kg).

2. Install the pivot pin, nut, and bolt securing the top of

the timing link to the boom.

3. Install the pivot pin, keeper pin, and bolt securing

the rod end of the lift cylinder to the boom.

4. Connect the hydraulic hoses at the rear of the tele-

scope cylinder as tagged during removal.

5. Install the master cylinder. Refer to Section 4.3, Mas-

ter Cylinder.

6. Operate the boom through all functions and check

for proper operation or any leakage.

Advertising