Blue Sea Systems 1801 Vessel Systems Monitor VSM 422 User Manual

Page 48

Advertising
background image

91

TROUBLESHOOTING

Tank level readings change when electronics are turned on.

Make sure that the negative feeds to the tank sensors are connected as
close to the battery as possible.

When using ultrasonic sensors, high level tank alarm sounds when
power is turned off.

Ultrasonic sensors require power to operate correctly and will show a full
tank when not powered.

State of Charge (SOC) stays at 100% even when the batteries are
being discharged.

Check to make sure that when the batteries are being discharged the DC
current is negative. If it is positive, reverse shunt sense wires.

Unexpected voltage readings are shown on meter.

Make sure that all of the battery grounds are connected to each other.
The VSM uses one common ground reference.

AC current shows greater than zero but the power reading is zero or
a negative value.

Reverse the AC current transformer leads. Follow WARNING on page 3
to avoid possibly lethal shock.

A calibration error screen keeps appearing.

Contact Blue Sea Systems Technical Support for repair or replacement.

Specifications subject to change. See www.bluesea.com for current information.

EC DECLARATION OF CONFORMITY

Manufacturer:

Blue Sea Systems

425 Sequoia Dr.

Bellingham, WA

98226 USA

(360) 738-8230

Product:

Vessel Systems Monitor

VSM 422

The undersigned hereby declares, on behalf of Blue Sea
Systems Inc., that the above-referenced product, to which this
declaration relates, is in conformity with the provisions of the
following Directive of the European Union:

EU 2004/108/EC/EMC Directive

The above-referenced product is in conformity with the following
harmonized standards:

Shipboard Bridge-Deck Equipment

Conducted Emissions Standard:

IEC 60945:2002

Radiated Emissions Standard:

IEC 60945:2002

Electrostatic Discharge
Immunity Standard:

IEC 60945:2002

Electrical Fast Transient/Burst
Immunity Standard:

IEC 60945:2002

The Technical Construction File required by this Directive is
maintained at the corporate headquarters of Blue Sea Systems Inc.,
425 Sequoia Dr., Bellingham, Washington.

Scott Renne
President

92

Specifications subject to change. See www.bluesea.com for current information.

Advertising