95 installation diagram – Blue Sea Systems 1801 Vessel Systems Monitor VSM 422 User Manual

Page 50

Advertising
background image

95

INSTALLATION DIAGRAM

Specifications subject to change. See www.bluesea.com for current information.

A

B

1

1

12

3

1

2

C

2

2 3 4 5 6 7 8 9 10 11

From negative

DC distribution

(all loads and

sources)

Fuse

(5 Amp)

AC

Reverse connections

#11 and #12

if kW ≠ positive

AC

LOADS

AC VOLTAGE

AND FREQUENCY

AC CURRENT

H

N

TEMPERATURE

SENSOR

can be connected in

either order

BATTERY

1

To Battery Switch

EXTERNAL SHUNT

Battery Side

Load Side

AC

COIL

BACK OF
THE METER

Fuse (0.5 Amp)

Install shunt for DC current measurement:

IMPORTANT! The shunt must be installed in the negative line to avoid
damage. Positive voltage applied to terminals #9 and #10 will cause damage
to the meter.
Install the shunt at any point in the DC negative feed line.Short sense
wires minimize voltage loss and interference, and result in the most
accurate metering.

There must be no loads connected to the battery terminal or the shunt of
Battery 1 or the Amp-Hour Function will not operate correctly.

Advertising