Elkhart Brass Sidewinder 7100 EXM Monitor User Manual

Page 16

Advertising
background image

16

Valve Plug

Actuator

Plug

Valve Plug

Locking Lever

Two-Way

Connector

Gasket Location

Electric Actuated Unibody Valve –

Install the valve into the water supply line.

Supply power to the valve by connecting the red and black leads coming from the valve plug to

an appropriate power source.

Using the black, green, and blue leads from the plug, connect the valve to the appropriate CAN

line.

Supply power to the valve actuator by connecting the actuator plugs.

Install a 30 Amp fuse to the positive power lead of the valve for a 12V system (15 Amp for 24V

system).

Nozzles –

Ensure there is a gasket inside the nozzle swivel.

Hand tighten the nozzle onto the monitor discharge.

Using the locking lever rotate the nozzle until it clicks into the desired flow setting slot.

Loosen the swivel to reposition the nozzle as shown (with the locking lever on the bottom).

Tighten the nozzle swivel with a spanner wrench.

Supply power to the nozzle by connecting the monitor and nozzle two-way connectors.

Advertising