6 starting the controller and dsm – Baldor MN1940 User Manual

Page 29

Advertising
background image

www.baldormotion.com

Operation 5-3

MN1940

5.1.6 Starting the controller and DSM

If you have followed the instructions in the previous sections, you should have now connected
power sources, inputs and outputs, and the USB cable linking the PC with the DSM. Before
you apply power for the first time, it is very important to verify the following:

H

Inspect all power connections for accuracy, workmanship and tightness.

H

Verify that all wiring conforms to applicable codes.

H

Check all signal wiring for accuracy.

1. Turn on the controller (e.g. NextMove ESB, if connected).

2. Turn on the motor power supply.

Advertising