Rockwell Automation Publication 1502-UM052H-EN-P - June 2013

39

Maintenance

Chapter 4

Figure 27 - Mounting and Retaining Bolt Removal

4. Loosen the load terminal nut on one bottle assembly, tilt the bottle

forward (out of the contactor) and unscrew it from the insulator stud as
shown in

Figure 28

. Repeat this for the two remaining bottles. The load

terminals, insulators and overtravel spring assemblies remain in the
contactor as shown in

Figure 28

.

Figure 28 - Removal of Vacuum Bottles

5. Install a new bottle by tilting an insulator forward and threading the bottle

onto the stud (reverse of Step 3). Take care to ensure the threads are
aligned as cross-threading can occur. Thread the bottle down, leaving a gap
of approximately 4.82 mm ± 0.25 mm (0.190 in. ± 0.01 in.) between the
top of the bottle and the bottom surface of the line terminal, as show in

Figure 29

. Use inside calipers and micrometer, or another accurate

measuring tool, to set the gap. This gap is precisely calibrated later in this
section. The wear indicator line on the bottom of the bottle’s movable
shaft must be facing forward (i.e. visible from the front of the contactor).
Repeat this step for the remaining two bottles.

Vacuum Bottle

Mounting Bolt

Load Terminal
Retaining Bolt
and Hardware

Insulator Stud

Load Terminal Nut