2 installation, 1 setting up the instrument, Packaging – Metrohm 762 IC Interface User Manual

Page 13: Check, Location, Arrangement of the instruments, 2 mains connection, Mains voltage and fuses, Mains cable, Switching the instrument on/off

Advertising
background image

2.1 Setting up the instrument

762 IC Interface

9

2

Installation

2.1

Setting up the instrument

2.1.1

Packaging

The 762 IC Interface is supplied together with the separately packed

accessories in special packagings containing shock-absorbing foam

linings designed to provide excellent protection. The instrument itself is

packed in an evacuated polyethylene bag to prevent the ingress of

dust. Please store all these special packagings as only they assure

transport of the instrument free from damage.

2.1.2

Check

After receipt, immediately check whether the shipment is complete and

has arrived without damage (compare with delivery note and list of

accessories in section 4.2). In the case of transport damage, see

instructions in section 4.4.1 "Warranty".

2.1.3

Location

Position the instrument in the laboratory at a location convenient for op-

eration, free from vibrations and protected against a corrosive atmos-

phere and contamination by chemicals.

2.1.4

Arrangement of the instruments

The 762 IC Interface can be piled up together with other IC instruments

(e.g. 732, 733, 709).

Advertising