Trebor Q-Series Di Water Heater User Manual

Page 12

Advertising
background image

PAGE 12

Q-SERIES DI HEATER OPERATION / MAINTENANCE MANUAL

Figure 3-1

Install access panel.

Check ground continuity on cabinet to any facility ground.

Remove Facility power Lockout/Tagout.

Restore Facility power supply to the heater.

Follow heater Pre-Start Inspection (see Section 4.1).

NOTE: Before starting the system, it is important to become familiar with
Sections 4 and 5. Only trained, qualified, authorized, personnel should
operate this system.

Advertising